Description
Newberry aluminum drop tubes are installed in the riser at the fill connection or attached to the bottom of overfill prevention valves to direct product flow from the fill point to within 6 inches of the tank bottom.
- Facilitates a submerged fill when properly installed.
- Improves flow efficiency.
- Reduces the build-up of vapors in the tank.
- .062 wall thickness for durability.
Â
Â



Reviews
There are no reviews yet.